A waste incinerator designed to burn 400,000 tonnes of rubbish a year is proposed for Lara, an area in the outskirts of Geelong. Locals frequently oppose the project on environmental grounds and because of a lack of information about who will build it.
A waste incinerator designed to burn 400,000 tonnes of rubbish a year is proposed for Lara, an area in the outskirts of Geelong. Locals vehemently oppose the project on environmental grounds and because of a lack of information about who will build it.