Sign in to search for past news!
June 22, 2025, 7 p.m.
From Jiangsu to Geelong: The Chinese state connections behind Lara's waste incinerator
From Jiangsu to Geelong: The Chinese state connections behind Lara's waste incinerator

A waste incinerator designed to burn 400,000 tonnes of rubbish a year is proposed for Lara, an area in the outskirts of Geelong. Locals frequently oppose the project on environmental grounds and because of a lack of information about who will build it.

From Jiangsu to Geelong: The Chinese state connections behind Lara's waste incinerator

A waste incinerator designed to burn 400,000 tonnes of rubbish a year is proposed for Lara, an area in the outskirts of Geelong. Locals vehemently oppose the project on environmental grounds and because of a lack of information about who will build it.

Sign in to see related stories!